homelab/.github/prompts/plan-homelabMCProadmap.prompt.md

5.6 KiB

Roadmap Plan: Homelab MCP Gateway Expansion

TL;DR

Evolve the current MVP into a production-grade platform by adding shards, hardening the gateway, improving security, expanding observability, and introducing mesh-ready capabilities only when justified.
Estimated total roadmap effort: 8 to 14 weeks (part-time homelab pace).

Planning Assumptions

  1. Work is done incrementally with validation after each phase.
  2. Existing Traefik shard and gateway baseline are already in place.
  3. Priority can shift based on incidents, new integrations, or time constraints.

Phases, Tasks, and Time Estimates

Phase Task Time to Complete Notes
Phase 1: Foundation Hardening Gateway health registry and shard auto-disable 0.5-1 day Prevents unhealthy shard routing
Phase 1: Foundation Hardening Standard error model and partial-failure handling 1-2 days Improves reliability and UX
Phase 1: Foundation Hardening Per-tool timeout/retry policy 0.5-1 day Fast resilience win
Phase 1: Foundation Hardening Basic rate limiting/per-client quotas 1 day Protects from accidental overload
Phase 1 Total 3-5 days
Phase Task Time to Complete Notes
Phase 2: Security Baseline Bearer token auth for gateway and shards 1-2 days Start simple, internal tokens
Phase 2: Security Baseline Tool-level RBAC (read vs admin tools) 1-2 days Reduces blast radius
Phase 2: Security Baseline Audit logging for every tool invocation 0.5-1 day Supports incident review
Phase 2: Security Baseline Secret management pattern (env + vault-ready abstraction) 1 day Keeps migration easy later
Phase 2 Total 3.5-6 days
Phase Task Time to Complete Notes
Phase 3: Documentation Intelligence Official-source allowlist for doc fetchers 0.5 day Limits bad sources
Phase 3: Documentation Intelligence Caching with TTL and source metadata 1 day Lower latency, fewer external calls
Phase 3: Documentation Intelligence Summarize-and-cite doc responses 1 day Better operator trust
Phase 3: Documentation Intelligence Upstream doc change detection (diff/check) 1-2 days Detects API drift
Phase 3 Total 3.5-4.5 days
Phase Task Time to Complete Notes
Phase 4: Additional Shards Dozzle shard (logs, stats, search) 3-5 days Highest immediate value
Phase 4: Additional Shards Authentik shard (apps/flows/branding) 4-6 days IAM controls require care
Phase 4: Additional Shards Gitea shard (repo/webhook/deploy metadata) 2-4 days Useful for GitOps visibility
Phase 4: Additional Shards Komodo shard (status + guarded deploy actions) 3-5 days Add write guardrails early
Phase 4 Total 12-20 days
Phase Task Time to Complete Notes
Phase 5: Traefik Shard Maturity Dry-run mode for route changes 1 day Safer ops
Phase 5: Traefik Shard Maturity Rollback snapshots/versioned configs 1-2 days Quick recovery path
Phase 5: Traefik Shard Maturity Conflict detection before writes 1 day Prevents route collisions
Phase 5: Traefik Shard Maturity Middleware preset library + validation 1-2 days Standardization
Phase 5 Total 4-6 days
Phase Task Time to Complete Notes
Phase 6: Test and Quality Gateway↔shard contract tests 1-2 days Prevents integration regressions
Phase 6: Test and Quality Mock-based shard simulation tests 1-2 days Faster local testing
Phase 6: Test and Quality CI checks for templates/scaffolded shards 1 day Enforces consistency
Phase 6: Test and Quality Post-deploy smoke test command 0.5-1 day Faster validation loop
Phase 6 Total 3.5-6 days
Phase Task Time to Complete Notes
Phase 7: Observability and Ops Structured logs with request IDs 0.5-1 day Better debugging
Phase 7: Observability and Ops Metrics: latency/error/utilization 1-2 days Capacity planning input
Phase 7: Observability and Ops Alerts for shard offline/state drift 1 day Operational guardrails
Phase 7: Observability and Ops Optional tracing across gateway/shards 1-2 days Add when needed
Phase 7 Total 3.5-6 days
Phase Task Time to Complete Notes
Phase 8: Mesh-Ready Evolution Service discovery abstraction 1-2 days Remove hardcoded endpoints
Phase 8: Mesh-Ready Evolution mTLS-ready client/server wrappers 2-3 days Security prep
Phase 8: Mesh-Ready Evolution Inter-service policy model 1-2 days Zero-trust stepping stone
Phase 8: Mesh-Ready Evolution Full cross-node mesh pilot (optional) 3-5 days Only if justified
Phase 8 Total 7-12 days

Suggested Execution Order (Pragmatic)

  1. Phase 1 Foundation Hardening
  2. Phase 2 Security Baseline
  3. Phase 4 Additional Shards (start with Dozzle first)
  4. Phase 3 Documentation Intelligence
  5. Phase 5 Traefik Maturity
  6. Phase 6 Test and Quality
  7. Phase 7 Observability and Ops
  8. Phase 8 Mesh-Ready Evolution (optional trigger-based)

Milestone Timing (High Level)

  1. Milestone A (Week 1-2): Foundation + Security done
  2. Milestone B (Week 3-6): Dozzle + one additional shard operational
  3. Milestone C (Week 6-8): Documentation intelligence + Traefik safety features
  4. Milestone D (Week 8-10): Test harness + operational observability
  5. Milestone E (Week 10+): Mesh-ready features or full mesh pilot if needed