Planning Document Standards
Purpose
This document defines the structure, formatting, and content requirements for all planning documents stored in documentation/plans/. These standards ensure consistency, enable accurate time estimation, and provide clear execution pathways for infrastructure changes.
Document Types
Migration Plans
Files prefixed with plan- that detail transitioning from one state to another.
Examples:
plan-gitcryptMigration.md— Implementing git-crypt for secret managementplan-ansibleSetup.md— Setting up Ansible control nodeplan-promptDistribution.md— Centralizing prompt repository
Implementation Guides
Step-by-step instructions for deploying new technologies or systems.
Roadmaps
Long-term strategic plans spanning multiple phases or quarters.
Required Document Structure
1. Header Section
Every plan must begin with:
# [Descriptive Title]: [Specific Goal]
## Overview
[2-3 sentence summary of what this plan accomplishes and why it matters]
**[Primary Metric]:** [Value/Target]
**[Secondary Metric]:** [Value/Target] (optional)
**End State:** [Concrete description of success]
**Estimated Time to Complete:** X-Y hours (first-time setup) | A-B hours (experienced operator)
Example:
# Ansible Control Node Setup: Path to Production Readiness
## Overview
Transform **Watchtower** (Raspberry Pi 5) into a production-ready Ansible control node capable of managing the entire homelab infrastructure.
**Control Node:** Watchtower (10.0.0.200) — Raspberry Pi 5, ARM Cortex-A76, 16GB RAM
**Managed Nodes:** Heimdall (10.0.0.151), Waldorf (10.0.0.251), Watchtower (localhost)
**End State:** Fully configured Ansible environment with validated connectivity, encrypted secrets, and role scaffolding.
**Estimated Time to Complete:** 2-3 hours (first-time setup) | 45-60 minutes (experienced operator)
2. Time Breakdown Table
Required immediately after Overview section:
## Time Breakdown by Phase
| Phase | Description | Time Estimate |
|-------|-------------|---------------|
| **Phase 1** | [Phase Name] | XX-YY minutes |
| **Phase 2** | [Phase Name] | XX-YY minutes |
| **Phase 3** | [Phase Name] | XX-YY minutes |
| **Phase N** | [Phase Name] | XX-YY minutes |
| **Total** | End-to-End [Process Name] | **X-Y hours** |
Guidelines:
- Use bold for phase numbers and total row
- Time estimates should be ranges (min-max) in minutes or hours
- Total should sum to the overall estimate in the Overview
- Include 3-6 phases typically (not too granular, not too broad)
For plans with multiple options:
## Time Breakdown by Implementation Option
| Option | Approach | Initial Setup Time | Ongoing Maintenance |
|--------|----------|-------------------|---------------------|
| **Option 1** | [Method] | X-Y hours | Z min/operation |
| **Option 2** | [Method] | X-Y hours | Z min/operation |
| **Option 3** | [Method] | X-Y hours | Z min/operation |
**Recommended:** Option [N] (detailed time breakdown below)
### Option [N]: Detailed Phase Breakdown
| Phase | Description | Time Estimate |
|-------|-------------|---------------|
[Standard phase table as above]
3. Prerequisites Section
Required before Phase 1:
## Prerequisites
- [ ] [Requirement 1]
- [ ] [Requirement 2]
- [ ] [Requirement 3]
- [ ] [Optional: Requirement 4 (optional, but recommended)]
Guidelines:
- Use checkboxes (
- [ ]) for trackability - List in order of validation (check access before checking software versions)
- Distinguish between required and optional prerequisites
- Include both technical and knowledge prerequisites
4. Phase Sections
Each phase must include:
## Phase [N]: [Phase Name]
**Estimated Time:** XX-YY minutes
[1-2 sentence phase description explaining the goal]
### Step [N]: [Step Name]
**Time:** X-Y minutes
[Step instructions with code blocks, explanations, and verification steps]
**[Optional Section: Why/Security Note/Troubleshooting]:**
[Additional context if needed]
Step-Level Requirements:
- Each step must have individual time estimate
- Include verification commands where applicable
- Add
# Expected: [output]comments to commands - Use consistent heading levels (## for Phase, ### for Step)
Example:
## Phase 1: Control Node Foundation (Watchtower Setup)
**Estimated Time:** 20-30 minutes
### Step 1: Install Ansible Toolchain
**Time:** 10-15 minutes (depends on network speed)
Connect to Watchtower via SSH and install the complete Ansible stack:
```bash
# SSH to Watchtower
ssh chester@10.0.0.200
# Update package index
sudo apt update
# Verify Ansible installation
ansible --version
# Expected: ansible [core 2.x.x] or newer
Why these tools:
ansible: Execution engineansible-lint: Code quality enforcement
---
### 5. Troubleshooting Section
**Required before final checklist:**
```markdown
## Troubleshooting
### Issue: [Symptom Description]
**Cause:** [Root cause explanation]
**Fix:**
```bash
[Commands to resolve]
[Optional: Additional context or prevention tips]
**Guidelines:**
- Anticipate 3-5 common failure modes
- Use consistent format: Issue → Cause → Fix
- Include verification steps in the fix
- Order by likelihood (most common first)
---
### 6. Summary/Checklist Section
**Required at end of document:**
```markdown
## Summary Checklist
- [ ] [Major milestone 1]
- [ ] [Major milestone 2]
- [ ] [Major milestone 3]
- [ ] [Verification step]
- [ ] [Documentation updated]
- [ ] [Changes committed to Git]
**Environment Status:** 🟢 **PRODUCTION READY** | 🟡 **TESTING** | 🔴 **NOT READY**
Optional sections:
## Migration Checklist
**Pre-Migration:**
- [ ] [Backup step]
- [ ] [Verification step]
**Migration Steps:**
- [ ] [Core steps from the plan]
**Post-Migration:**
- [ ] [Validation]
- [ ] [Documentation]
- [ ] [Cleanup]
7. Document Metadata (Footer)
Required at very end:
---
**Document Version:** X.Y
**Last Updated:** [Month DD, YYYY]
**Author:** [Author Name/Tool]
**Review Cycle:** [Quarterly | Monthly | After infrastructure changes]
Formatting Standards
Time Estimates
Range Format:
- Use ranges for uncertainty:
10-15 minutes,2-3 hours - Larger range for first-time:
2-3 hours (first-time) - Smaller range for experienced:
45-60 minutes (experienced)
Never use:
- Exact times without ranges: ❌
15 minutes - Vague estimates: ❌
about an hour,quickly
Code Blocks
Always specify language:
```bash
# Good: Language specified
Bad: Generic code block
Include expected outputs:
ansible --version
# Expected: ansible [core 2.x.x] or newer
Add comments explaining why:
# Generate ED25519 key (modern, secure, fast)
ssh-keygen -t ed25519 -C "ansible@watchtower"
Emphasis & Highlighting
Use bold for:
- Phase names in tables
- Important: warnings or critical notes
- Goal: objective statements
- Key metrics in overview
Use inline code for:
- File paths:
ansible/ansible.cfg - Commands:
git-crypt unlock - Variables:
vault_password_file - Package names:
ansible-lint
Use INFO blocks for decisions:
**Key Decisions:**
- `host_key_checking = False`: Simplifies homelab automation (acceptable for trusted private network)
- `forks = 3`: Limits parallel execution (prevents overwhelming Pi resources)
Lists & Tables
Checkbox lists for trackable items:
- [ ] Ansible toolchain installed
- [ ] SSH keys distributed
- [ ] First playbook run successful
Markdown tables for comparisons:
| Option | Pros | Cons | Time |
|--------|------|------|------|
| A | Fast | Complex | 1h |
| B | Simple | Slow | 3h |
Links & References
Internal links use relative paths:
See [ansible/.ansible-lint](ansible/.ansible-lint) for configuration.
External links use full URLs:
Git-crypt Documentation: https://github.com/AGWA/git-crypt
Related documentation section:
## Related Documentation
- [SECURITY_AUDIT_REPORT.md](../documentation/SECURITY_AUDIT_REPORT.md) - Security findings
- [SOP-001](../documentation/SOPs/SOP-001-Example.md) - Related procedure
Optional Sections (Use When Applicable)
Rollback Plan
For destructive or risky migrations:
## Rollback Plan
If [technology] causes issues:
```bash
# 1. Stop service
# 2. Restore backup
# 3. Revert configuration
Recovery Time: Estimated X-Y minutes
### Migration Strategy (Multi-Week Plans)
For staged rollouts:
```markdown
## Migration Strategy
**Total Timeline:** [N] weeks (staged rollout) | [M] days (aggressive deployment)
### Week 1: [Phase Name]
**Time:** X-Y hours
[Objectives]
### Week 2: [Phase Name]
**Time:** X-Y hours
[Objectives]
Security Considerations
For security-sensitive plans:
## Security Considerations
### [Area of Concern]
- [Risk description]
- [Mitigation strategy]
- [Verification method]
Maintenance & Next Steps
For ongoing operations:
## Maintenance & Next Steps
### Ongoing Operations
**[Operation Name]:**
```bash
[Command]
Future Enhancements
- [Enhancement Name]:
- [Description]
- [Estimated effort]
---
## Success Criteria Template
Each plan should define measurable success criteria:
```markdown
## Success Criteria
- ✅ [Technical validation 1]
- ✅ [Technical validation 2]
- ✅ [Functional test passed]
- ✅ [Documentation updated]
- ✅ [Zero errors in logs]
**Estimated Migration Time:** [Same as in overview]
**Maintenance:** [Ongoing time commitment]
File Naming Convention
Pattern: plan-[technology][Action].md
Examples:
plan-ansibleSetup.md— Setup/installation guideplan-gitcryptMigration.md— Migration from one state to anotherplan-promptDistribution.md— Distribution/deployment plan
Rules:
- Use camelCase for multi-word components
- No spaces or special characters
- Prefix always
plan- - Suffix always
.md
Quality Checklist
Before committing a planning document, verify:
- Overview includes total time estimate
- Time breakdown table present and accurate
- Prerequisites listed with checkboxes
- Each phase has time estimate
- Each step has individual time estimate
- Code blocks specify language
- Expected outputs documented
- Troubleshooting section included
- Summary checklist present
- Document metadata complete
- All links are valid
- Formatting consistent with examples
- Success criteria defined
- Related documentation referenced
Anti-Patterns (Common Mistakes)
❌ Missing time estimates:
## Phase 1: Setup
### Step 1: Install tools
✅ Correct format:
## Phase 1: Setup
**Estimated Time:** 20-30 minutes
### Step 1: Install tools
**Time:** 10-15 minutes
❌ Vague success criteria:
- Everything works
- No errors
✅ Specific validation:
- ✅ All nodes respond to `ansible all -m ping`
- ✅ Zero lint errors when running `ansible-lint playbooks/*.yml`
- ✅ Validation playbook completes with exit code 0
❌ Commands without context:
git-crypt unlock
cat nodes/waldorf/plex/.env.secrets
✅ Commands with verification:
# Unlock with the key
git-crypt unlock ~/homelab-secrets.key
# Verify decryption worked
cat nodes/waldorf/plex/.env.secrets
# Expected: plaintext secrets (not binary data)
❌ Flat structure (no phases):
# Setup Guide
## Step 1
## Step 2
## Step 3
[... 20 more steps ...]
✅ Hierarchical organization:
# Setup Guide
## Phase 1: Foundation (30-40 min)
### Step 1 (10 min)
### Step 2 (20 min)
## Phase 2: Configuration (20-30 min)
### Step 3 (15 min)
### Step 4 (10 min)
Example Template
Use this as a starting point for new planning documents:
# [Title]: [Goal]
## Overview
[Description]
**[Key Metric 1]:** [Value]
**[Key Metric 2]:** [Value]
**End State:** [Success description]
**Estimated Time to Complete:** X-Y hours (first-time) | A-B hours (experienced)
---
## Time Breakdown by Phase
| Phase | Description | Time Estimate |
|-------|-------------|---------------|
| **Phase 1** | [Name] | XX-YY minutes |
| **Phase 2** | [Name] | XX-YY minutes |
| **Total** | End-to-End | **X-Y hours** |
---
## Prerequisites
- [ ] [Requirement 1]
- [ ] [Requirement 2]
---
## Phase 1: [Name]
**Estimated Time:** XX-YY minutes
### Step 1: [Action]
**Time:** X-Y minutes
```bash
# Commands
Phase 2: [Name]
Estimated Time: XX-YY minutes
Step 2: [Action]
Time: X-Y minutes
Troubleshooting
Issue: [Problem]
Cause: [Explanation] Fix:
# Solution
Summary Checklist
- [Milestone 1]
- [Milestone 2]
Environment Status: 🟢 PRODUCTION READY
Document Version: 1.0 Last Updated: [Date] Author: [Name] Review Cycle: Quarterly
---
## Enforcement
This standard applies to:
- All files in `documentation/plans/`
- Migration guides
- Implementation roadmaps
- Multi-phase technical projects
**Exclusions:**
- Quick reference guides (use KBA format instead)
- Single-step procedures (use SOP format instead)
- Architecture diagrams (standalone)
---
**Document Version:** 1.0
**Last Updated:** April 12, 2026
**Author:** FrankGPT (Ansible Architect Mode)
**Review Cycle:** Quarterly or when planning format needs evolve